Bennetts supplies four Raimondi cranes for Berkshire project

Publish April 20, 2022
real estate

Official Raimondi agent of UK, Bennetts Cranes, has deployed two Raimondi flattop tower cranes MRT159 and two LR213 luffing jib cranes for a prestigious residential development in Southern England.

The new riverside development, located in Berkshire, England, is part of the town renewal plan aiming to transform the city into an urban hub.

“We are proud to continue boosting our relationship with Berkeley Homes, developer of the project, by supplying these four modern Raimondi machines to the Reading jobsite. The LR213 luffing jib cranes were ideal for avoiding over-sail boundaries due the model’s 38m hook radius. The MRT159s were chosen due for ease of installation and onsite versatility,” explained Edward Saeger, Managing Director, Bennetts Cranes.

Jobsite challenges

The LR213s were erected in different periods in 2020, and have not changed positions, whereas the MRT159s have been relocated to second site positioning. “The key here was having flattops with all parts preassembled, ropes passed, and rope connections installed. This was an added boon, facilitating dismantle and re-installation procedures,” he added.

Seager added that there were jobsite challenges, including supplying cranes that have a short out of service radius. This was to enable work continuation after the first blocks were completed without over-sailing the occupied flats. Secondly, ensuring that Covid-19 government regulations during operational duties were adhered to, such as maintaining a two metres distance between the installation crew members.

“We not only had to carefully study the positioning of each crane through the jobsite progression, but also, with the LR213s being installed in the middle of the pandemic, we had to reinvent the erecting and dismantling methodology to comply with the safety norms in order to carry out the job.”

With one Raimondi MRT159 recently dismantled, there are currently two 14t-luffers operating onsite with heights of 40m and jib lengths of 50m, and the remaining 8tn-topless tower crane, with tower height of 36m and jib of 38m.

700 modern apartments

The cranes are all expected to be dismantled in the upcoming months in line with project’s completion. The completed complex will feature 700 modern apartments, alongside a central square with amenities such as a cafe, restaurant, gym, and nursery.

tradearabia

Latest Stories

Hospital in Sana'a launches free medical week

2021-09-12 03:00:00

SANA'A, Sep. 11 (Saba) - September 26 Hospital Authority in Bani Matar dstrict of Sana'a province launched on Saturday a"...
Read More

Yemeni restaurant opening in Newport: What you need to know

2021-09-09 06:00:00

NEWPORT is set to be home to what is calling itself the city’s “first Yemeni restaurant.”

Located"...
Read More

Yemen Socio-Economic Update, Issue 59 - April 2021

2021-08-09 04:00:00
The impact of War.. The role of Women in Building Peace.. Required Interventions The Editorial Since the escalation of conflict and war, women in Yemen can said to be the most affected group in the society. These conditions have imposed a new reality on women and re-determined their roles and lifestyles,......
Read More

Abu Dhabi hotels post record occupancy in June-

2021-07-14 04:00:00

Abu Dhabi’s hotel industry has reported its highest occupancy since the start of the pandemic, according to preliminary June"...
Read More